CSF2 – Expansion Chamber Purge Type

Features

  • Sampling from devices or process lines
  • System purge and expansion chamber purge
  • Predefined sampling volume controlled by an expansion chamber to ensure safe sampling
  • Easy operation with a single handle

Basic Configuration

Typical Installation Mode

Operation

1 – Preparation: install the sample cylinder and connect the hose to the bottom side of the cylinder. Open the needle valves at both ends of the cylinder.
2 – Sampling: turn the handle to the “PROCESS” position, allowing the sample to flow continuously into and fill the cylinder. Hold for a period of time to ensure representative sampling.
3 – Expansion: turn the handle to the “EXPANSION” position, connecting the cylinder with the expansion chamber. Hold for a period of time to transfer a portion of sample to the expansion chamber. Close the needle valves at both ends of the cylinder.
4 – Depressurisation/Vent: open the ball valve on the expansion chamber to depressurise and discharge the residual sample out of the sampling line and the expansion chamber. Subsequently, close the ball valve.
5 – Off: turn the handle to the “OFF” position and disconnect the hose. Remove the cylinder and connect the hose to the top quick-connect to complete the sampling process.

For more information into FITOK sampling systems please contact our sales team: sales@nvfcl.com or call 01942601209